Linde-Griffith Construction Co.'s specialties are many, all revolving around deep foundations and marine construction. They include:

  • Driven Foundation Piles – timber, pipe, H-pile, pre-cast concrete;

  • Soil Retaining Structures – steel sheet piles, soldier piles and lagging;

  • Earth Anchors & Rock Anchors;



  • Drilled Foundation Piles - micro piles & mini piles;




  • Caissons (to a maximum of 84” diameter);

  • Marine Construction & Bulkheads;

Most important, our attention to detail and service to our customers are legendary and without peer in the industry.

 

DRIVEN FOUNDATION PILES

Linde-Griffith Construction Co. traditionally has been known as the premier pile driving firm in New Jersey. Our fleet has more than twenty pile driving rigs capable of installing conventional piles, as small as six inches and as large thirty-six inches in diameter. The lengths of these piles range from as short as five feet (spliced sectional piles in limited headroom conditions) to as long as three hundred feet (driven in one hundred twenty foot sections and spliced).

Linde-Griffith Construction Co. is the only pile driving firm in New Jersey that has the equipment capabilities, the technical expertise, and the construction know-how to install the vast range of piles that is required. Whether the pile locations are close to the rig's access or as far away as fifty-seven feet, Linde-Griffith Construction Co. has and can install them. This capability is just one of the many that separates Linde-Griffith Construction Co. from the others. WE DO IT ALL!


DRILLED FOUNDATION PILES, EARTH & ROCK ANCHORS, AND CAISSONS

Although Linde-Griffith Construction Co. has historically been known as a "conventional pile driving specialist", we are far from limited to that role. Our fleet of drills includes equipment for installing all sizes of soil and rock anchors, auger rigs for installing caissons to a maximum of eighty-four inches, and rigs for installing micro piles and mini piles.

Soil and rock anchors often offer the most economical solution to temporary or permanent site stability or excavation support requirements. Linde-Griffith Construction Co. designs these anchors to withstand the project's anticipated loads. The use of these anchors is not uncommon with temporary deep excavation retaining systems or as a component of permanent retaining walls. Linde-Griffith Construction Co. utilizes various drilling methods, such as rotary duplex with air and water, pneumatic, open hole, and others, to install the anchors.

Linde-Griffith Construction Co. installs micro piles to stabilize settling or deteriorating foundations or to increase the capacity of footings in limited headroom conditions or where access for conventional equipment is restricted. These small diameter, friction and/or end bearing, deep foundation tools can transfer ultimate loads of up to three hundred fifty tons to a competent soil/rock stratum.

Heavy concentrated foundation loads often are transferred to competent bearing by utilizing caissons. Linde-Griffith Construction Co. has the capability to install caissons to a maximum of eighty-four inches in diameter into soil or the hardest rock formations.

 

"When you need us we are there!"

Linde-Griffith Construction Co. realizes the importance of on-time project starts and early project completions. Linde-Griffith Construction Co. believes we demonstrate the care for our customers and the expertise for their projects better than anyone else does. To insure this, Linde-Griffith Construction Co. employs a strict level of control over all our operations.

Linde-Griffith Construction Co. is self-reliant. This is evidenced by every aspect of our project management and control, from our in-house capacity to mobilize cranes and equipment, to our on-staff construction and layout services, to our ability to adjust immediately to varying material requirements, to our daily supervision of each project. Linde-Griffith Construction Co. employs our own personnel and utilizes our own equipment, depending on no outside vendor to service our projects.

Linde-Griffith Construction Co., with our fleet of heavy-duty tractors and trailers, moves our own cranes and equipment, sometimes within hours of our customer’s order. Linde-Griffith Construction Co. is mobilized and ready to commence construction operations, often times, in less than one day after receiving the notice to proceed.

An owner of Linde-Griffith Construction Co. supervises each of our projects. This on-site executive management and supervision allows for timely, accurate, and committed field decisions. This practice further demonstrates to each of our customers that their project is being constructed by a professional pile driving company that has a vested interest in mutual success.

  © Copyright 2002-2003, Linde-Griffth Construction Co.